The magnetic circuit section of the automatic round internal-magnet speaker assembly line is what a manual line calls the front end (section A). It completes automatic assembly of the washer, magnet and frame, using automatic or semi-automatic manipulators throughout to achieve unmanned assembly and lower labour cost.
Quality control is equally strong. Assembly consistency, repeat positioning and operator error are held to tight limits, which greatly improves product stability.
Operator involvement is largely eliminated. A microcomputer handles control ergonomics and removes the variability of human mood, while the mechanical sequence runs without operators. The skill threshold drops, soft-material staffing falls to a minimum and physical effort is greatly reduced.
The machine meets three requirements: 1) fewer operators, 2) better quality, 3) lean management.
3. Efficiency Assessment
Manual process flow and staffing:
Main magnet section:
Manual terminal fitting (1) → manual frame adhesive (1) → manual magnet placement (1) → manual adhesive (1) → manual magnet placement (1) → manual magnet adhesive (1) → manual washer placement (1) → manual jig insertion (1) → drying → manual jig removal
8 operators in total. Capacity: 1200–1500 pcs.
Manual process flow diagram, main magnet section
Automated process flow and staffing:
Main magnet section:
Automatic main jig loading → automatic washer loading → automatic washer adhesive → automatic magnet assembly → automatic magnet adhesive → automatic shim fitting (some models) → automatic shim adhesive → manual terminal fitting and frame placement (1) → drying → automatic pick-up
1 operator in total. Capacity: 1200–1500 pcs.





![]() | ![]() | ![]() |
![]() | ![]() | ![]() |